Building Advanced Digital Infrastructure

Set within one of the nation’s most connected regions, this campus brings together 36 MW of critical IT load and 126,000 sq ft of high-performance IT space to support the next generation of AI and cloud computing. As the design and construction team advanced the vision for a secure and efficient facility, our team partnered to deliver a cohesive exterior expression while meeting a demanding schedule and performance goals.

The main data hall features a prefabricated architectural building envelope with sandblast buff tint and a ribbed pattern to create a refined texture across the structure. Bump-out stair-shafts are finished in metallic black, paired with ribbed elements in a contrasting metallic white. Along the front office zone, every panel was treated with a field-applied stain to reflect the look of metal panel to match adjacent campus developments, without the cost, complexity, or maintenance concerns of true metal cladding.

Year
2024
Building Systems
Architectural
Design Features
Architectural Textures, Painted/Stained, Sandblast

Ready to transform your community?