Built for Community

Arvada Aquatics Center is a state-of-the-art natatorium that replaced the former George J. Meyers Swimming Center. The facility now serves as a primary venue for competitive swimming, recreation, and community programming. The new center was constructed on the existing site’s parking lot, allowing the original facility to remain operational throughout most of the construction process. Community input played a vital role in shaping the final design, ensuring the space reflects local needs and priorities.

The space features a 50-meter competition pool accompanied by elevated stadium seating built directly above the locker rooms, and a four-lane, 25-meter auxiliary pool with a walk-in ramp. Working closely with the design and construction teams, Wells delivered prefabricated walls, stadia, raker beams, and columns that shape the elevated seating and support the required durability for a recreational facility.

Year
2024
Building Systems
Architectural, Structural
Design Features
Architectural Textures

Ready to transform your community?