Redefining the Stadium Experience

In the early 2000s, Wells worked on a substantial modification to University of Wisconsin’s Camp Randall. The entire bowl area was redesigned and rebuilt, with Wells delivering an integrated prefabricated structural solution that supported new seating. The modifications included three levels of prefabricated structure on the south end of the field in front of the UW Field House. Around the same time, Wells collaborated on the design and delivery of a custom formliner for the concession and utility buildings next to the stadium, which included cast-in Badger football helmets.

Most recently, the University wanted a complete overhaul of the stadium’s south end zone seating, which was standard bleacher seating installed over the structural precast. The renovation consisted of replacement to the infrastructure, terrace and concourse area at the stadium. The new plan created synergies for the UW Field House and provided new choices for premium seating — including field level boxes, ledge seating, club seating and a party deck and upper terrace with a bar. Wells was involved early in the design process to ensure risers in the right configuration were delivered and in a color that could seamlessly blend in to the existing structural precast.

Year
2022
Building Systems
Structural
Design Features
Architectural Features

Ready to transform your community?