Design-Assist Precision Advancing Healthcare Construction

At Cook Children’s Medical Center South in Fort Worth, the tower expansion called for an approach that could accelerate delivery while honoring the character of the existing campus. Wells partnered early with the design team through a design-assist process, bringing prefabrication expertise and an integrated facade system that supported an estimated six-month schedule reduction. Off-site construction and proactive coordination created predictability from concept through installation — without compromising performance or architectural intent.

Building information modeling strengthened collaboration across disciplines, providing a shared platform that improved coordination, reduced waste and carried seamlessly into construction documentation. This alignment enabled informed decision-making and streamlined execution at every stage.

Owner
Cook Children's Medical Center
Year
2014
Building Systems
Architectural
Design Features
Emulated Materials

Ready to transform your community?